The resource-constrained project scheduling problem (RCPSP) consists of activities that must be scheduled subject to precedence and resource constraints such that the makespan is minimized. It has become a well-known standard problem in the context of project scheduling which has attracted...
Persistent link: https://www.econbiz.de/10010304664
This paper discusses an extension of the classical resource-constrained project scheduling problem (RCPSP) in which the resource availability as well as the resource request of the activities may change from period to period. While the applicability of this extension should be obvious, we...
Persistent link: https://www.econbiz.de/10010304665
Persistent link: https://www.econbiz.de/10011817513
Persistent link: https://www.econbiz.de/10011817514
Persistent link: https://www.econbiz.de/10011558729
Persistent link: https://www.econbiz.de/10011558734
This paper introduces a new general framework for genetic algorithms to solve a broad range of optimization problems. When designing a genetic algorithm, there may be several alternatives for a component such as crossover, mutation or decoding procedure, and it may be difficult to determine the...
Persistent link: https://www.econbiz.de/10011558747
This paper considers two problem classes that are important to researchers as well as practitioners, namely packing and project scheduling problems. First, the two problem categories are described. This includes a classification of packing problems as well as of project scheduling concepts....
Persistent link: https://www.econbiz.de/10011558750
This paper introduces an approach for generating scenarios of sea port container terminals. A scenario consists of arrivals of deep sea vessels, feeder ships, trains, and trucks together with lists of containers to be loaded and unloaded. Moreover, container attributes such as size, empty,...
Persistent link: https://www.econbiz.de/10011558784
In this paper, we propose a general model for various scheduling problems that occur in container terminal logistics. The scheduling model consists of the assignment of jobs to resources and the temporal arrangement of the jobs subject to precedence constraints and sequence-dependent setup...