This paper deals with the resource-constrained project scheduling problem with partially renewable resources and general temporal constraints with the objective to minimize the project duration. The consideration of partially renewable resources allows to integrate the decision about the...
Persistent link: https://www.econbiz.de/10015193029
The concept of partially renewable resources provides a general modeling framework that can be used for a wide range of different real-life applications. In this paper, we consider a resource-constrained project duration problem with partially renewable resources, where the temporal constraints...
Persistent link: https://www.econbiz.de/10014497492
Persistent link: https://www.econbiz.de/10014497572
Persistent link: https://www.econbiz.de/10014503565
In this paper, we consider the resource-constrained project scheduling problem with partially renewable resources and general temporal constraints. For the first time, the concept of partially renewable resources is embedded in the context of projects with general temporal constraints. While...
Persistent link: https://www.econbiz.de/10014503793
In reverse logistics networks, products (e.g., bottles or containers) have to be transported from a depot to customer locations and, after use, from customer locations back to the depot. In order to operate economically beneficial, companies prefer a simultaneous delivery and pick-up service....
Persistent link: https://www.econbiz.de/10010421381
Kundinnen und Kunden kommunizieren, kaufen und teilen Produkte und Dienstleistungen über digitale Plattformen, in denen technische Möglichkeiten zur Präsentation sensorischer Elemente im Normalfall auf visuelle, akustische und schriftliche Elemente begrenzt sind. Um das sensorische...
Persistent link: https://www.econbiz.de/10014377033
In recent years, new resource types have been established in project scheduling. These include so-called partially renewable resources, whose total capacity applies only to a subset of periods in the planning horizon. In this paper, we consider the extension of the resource-constrained project...
Persistent link: https://www.econbiz.de/10015371251
In this paper, we consider a resource overload problem and add a tardiness penalty to the objective function when a prescribed project makespan is exceeded, which enables a trade-off between a balanced resource utilization and a project delay. For the tardiness penalty, we distinguish between a...
Persistent link: https://www.econbiz.de/10015371257