Showing 1 - 10 of 10
This paper addresses the parallel machine scheduling problem in which the jobs have distinct due dates with earliness and tardiness costs. New lower bounds are proposed for the problem, they can be classed into two families. First, two assignment-based lower bounds for the one-machine problem...
Persistent link: https://www.econbiz.de/10005283368
Persistent link: https://www.econbiz.de/10005355031
This paper introduces new environmental constraints, namely carbon emission constraints, in multi-sourcing lot-sizing problems. These constraints aim at limiting the carbon emission per unit of product supplied with different modes. A mode corresponds to the combination of a production facility...
Persistent link: https://www.econbiz.de/10010608506
Chains of operations have to be scheduled on a single machine such that a minimum delay is set between any two operations linked by a precedence relation. Three sub-problems are shown to be solved in polynomial time. First, we consider the problem of minimizing the makespan when all the...
Persistent link: https://www.econbiz.de/10010847713
Chains of operations have to be scheduled on a single machine such that a minimum delay is set between any two operations linked by a precedence relation. Three sub-problems are shown to be solved in polynomial time. First, we consider the problem of minimizing the makespan when all the...
Persistent link: https://www.econbiz.de/10010950126
Persistent link: https://www.econbiz.de/10005144274
Persistent link: https://www.econbiz.de/10005144303
Persistent link: https://www.econbiz.de/10005236890
Persistent link: https://www.econbiz.de/10005151464
Persistent link: https://www.econbiz.de/10005240182