Showing 1 - 10 of 274
Persistent link: https://www.econbiz.de/10010926457
Persistent link: https://www.econbiz.de/10010927205
In problems involving the simultaneous optimization of production and transportation, the requirement that an order can only be shipped once its production has been completed is a natural one. One example is a problem of optimizing shipping costs subject to a production capacity constraint...
Persistent link: https://www.econbiz.de/10008483399
Persistent link: https://www.econbiz.de/10010674868
Persistent link: https://www.econbiz.de/10010674883
Persistent link: https://www.econbiz.de/10010704217
Persistent link: https://www.econbiz.de/10005042895
Persistent link: https://www.econbiz.de/10005043158
Persistent link: https://www.econbiz.de/10005043257
Persistent link: https://www.econbiz.de/10005043308