Showing 1 - 10 of 41
Persistent link: https://www.econbiz.de/10005408675
Persistent link: https://www.econbiz.de/10011161926
Persistent link: https://www.econbiz.de/10011162003
We study a single-product single-location inventory system under periodic review, where excess demand is lost and the replenishment lead time is positive. The performance measure of interest is the long-run average holding cost and lost sales penalty cost. For a large class of demand...
Persistent link: https://www.econbiz.de/10009191251
Persistent link: https://www.econbiz.de/10005389232
We characterize environmental quality as a stock, and its rate of deterioration as a flow. We consider a class of problems, which we call “SFQ” problems, in which both stocks and flows can be controlled to promote the quality of a resource stock. Abatement (curbing the flow) and restoration...
Persistent link: https://www.econbiz.de/10005002350
Oblivious equilibrium is a new solution concept for approximating Markov perfect equilibrium in dynamic models of imperfect competition among heterogeneous firms and has recently been used in multiple economic studies. In this paper, we present algorithms for computing oblivious equilibrium and...
Persistent link: https://www.econbiz.de/10005553395
We propose an approximation method for analyzing Ericson and Pakes (1995)-style dynamic models of imperfect competition. We develop a simple algorithm for computing an "oblivious equilibrium," in which each firm is assumed to make decisions based only on its own state and knowledge of the long...
Persistent link: https://www.econbiz.de/10005553511
This paper explores the connection between three important threads of economic research offering different approaches to studying the dynamics of an industry with heterogeneous firms. Finite models of the form pioneered by Ericson and Pakes (1995) capture the dynamics of a finite number of...
Persistent link: https://www.econbiz.de/10009318594
This paper develops the first method for the exact simulation of reflected Brownian motion (RBM) with non-stationary drift and infinitesimal variance. The running time of generating exact samples of non-stationary RBM at any time $t$ is uniformly bounded by $\mathcal{O}(1/\bar\gamma^2)$ where...
Persistent link: https://www.econbiz.de/10010727642