Showing 1 - 10 of 62
An alternative heuristic method for scheduling repetitive projects in which resources are limited and activities may be executed with multiple modes of resource demands associated with different durations is proposed. Unlike general heuristic methods that separately analyze each competing...
Persistent link: https://www.econbiz.de/10005482401
Persistent link: https://www.econbiz.de/10005287695
Reduction in construction project duration is generally linked to additional cost due to more expensive resources required. Hence tradeoff between time and cost is crucial to the efficiency of a construction project. The time-cost tradeoff (TCT) issue has been studied through various...
Persistent link: https://www.econbiz.de/10008603277
The hook times of mobile cranes are processes that are of non-linear and discrete nature. Artificial neural network is a data processing technique that lends itself to this kind of problem. Three common artificial neural network architectures - multi-layer feed-forward (MLFF), group method of...
Persistent link: https://www.econbiz.de/10005445627
Persistent link: https://www.econbiz.de/10005284222
Consultants' fees and technical submissions in two-envelope fee tendering are usually converted to scores. The fee scores and technical (quality) scores are then multiplied by predetermined weightings and aggregated. To preserve the desired influence of the predetermined weightings, the fee...
Persistent link: https://www.econbiz.de/10005482455
Very few construction companies and consulting firms in Australia measure their costs of quality. Consequently, it is difficult for them to prove that systems for preventing quality failures are cost-effective. Although the direct costs of a quality system can be quantified with some accuracy...
Persistent link: https://www.econbiz.de/10005482493
The briefing process is critical to the successful delivery of construction projects. Although a number of briefing guides have been developed, attempting to address the problems of briefing, they are often criticized as being too general and implicit. This paper describes a structured framework...
Persistent link: https://www.econbiz.de/10005482571
A remarkable disagreement/deviation between the rate of ISO 14001 registration and the rate of implementation of environmental impact assessment in the Chinese construction industry indicates that the contractors there might not have really applied environmental management (EM) in construction...
Persistent link: https://www.econbiz.de/10005482676
Learning from manufacturing industries is a useful approach to improving the productivity of the construction industry and to solve problems arising from construction processes. Through the use of virtual prototyping (VP) technology, the lean production process engaged in the IKEA business model...
Persistent link: https://www.econbiz.de/10005438607