Showing 1 - 10 of 23
This research is a further development of our recent papers [2, 3]. A production system produces a given target amount by a given due date and has several possible speeds which are subject to random disturbances. The system's output can be measured only at present inspection (control) points....
Persistent link: https://www.econbiz.de/10010749914
Persistent link: https://www.econbiz.de/10005311966
Persistent link: https://www.econbiz.de/10005337286
Persistent link: https://www.econbiz.de/10005347204
Persistent link: https://www.econbiz.de/10005287820
Persistent link: https://www.econbiz.de/10005253258
Consider an m-machine production line for processing identical parts served by a mobile robot. The problem is to find the minimum cycle time for 2-cyclic schedules, in which exactly two parts enter and two parts leave the production line during each cycle. This work treats a special case of the...
Persistent link: https://www.econbiz.de/10008865192
Persistent link: https://www.econbiz.de/10005414332
Persistent link: https://www.econbiz.de/10005417883
We are concerned with a problem of scheduling a flexible manufacturing cell with random time operations. A job-shop production section comprises a set of n jobs (orders) and a set of m machines (processors). Each order consists of a chain of operations, each of which needs to be executed during...
Persistent link: https://www.econbiz.de/10010870079