Showing 1 - 10 of 44
In this paper, permutation flow shops with total flowtime minimization are considered. General flowtime computing (GFC) is presented to accelerate flowtime computation. A newly generated schedule is divided into an unchanged subsequence and a changed part. GFC computes total flowtime of a...
Persistent link: https://www.econbiz.de/10005206116
In this paper, no-wait job shop problems with makespan minimization are considered. It is well known that these problems are strongly NP-hard. The problem is decomposed into the sequencing and the timetabling components. Shift timetabling is developed for the timetabling component. An effective...
Persistent link: https://www.econbiz.de/10004973500
For the no-wait flowshop scheduling problem with maximum lateness criterion, properties are developed to speed up three kinds of basic operations generating candidate solutions, i.e., the insertion of a new job into a partial sequence, and the insertion and exchange neighborhood moves. The...
Persistent link: https://www.econbiz.de/10008494763
In this paper, a HGA (hybrid genetic algorithm) is proposed for permutation flowshop scheduling problems (PFSP) with total flowtime minimization, which are known to be NP-hard. One of the chromosomes in the initial population is constructed by a suitable heuristic and the others are yielded...
Persistent link: https://www.econbiz.de/10005158584
Strong uncertainties is a key challenge for the application of scheduling algorithms in real-world production environments, since the optimized schedule at a time often turns to be deteriorated or even infeasible during its execution due to a large majority of unexpected events. This paper...
Persistent link: https://www.econbiz.de/10011264332
Many real-world networks exhibit community structure where vertices belong to one or more communities. Recent studies show that community structure plays an import role in epidemic spreading. In this paper, we investigate how the extent of overlap among communities affects epidemics. In order to...
Persistent link: https://www.econbiz.de/10011117849
In this paper, we focus on the relationship between operations-based variables (specifically, production speed, scrap rate and maintenance speed) and the manufacturing cost. These variables usually produce opposite influences on the variable cost and the fixed cost. For example, setting the...
Persistent link: https://www.econbiz.de/10010729601
This paper studies a job shop scheduling problem with two new objective functions based on the setup and synergy costs besides the traditional total weighted tardiness criterion. The background is found in the real-world situation of a commercial vehicle producer, where the reduction of...
Persistent link: https://www.econbiz.de/10010869099
The job shop scheduling problem (JSSP) has attracted much attention in the field of both information sciences and operations research. In terms of the objective function, most existing research has been focused on the makespan criterion (i.e., minimizing the overall completion time). However,...
Persistent link: https://www.econbiz.de/10010594388
This paper studies a newsvendor game in which two substitutable products are sold by two different retailers (newsvendors) with loss-averse preferences. Each loss-averse retailer facing stochastic customer demand and deterministic substitution rate will make an order quantity decision to...
Persistent link: https://www.econbiz.de/10010594395