Service and construction require large resource, thus there is a need for a comprehensive method for optimal resource allocation. The purpose of this study is to develop and use scaled critical factor index (SCFI) for sustainable resource allocations in a service provision company and a lean...
Persistent link: https://www.econbiz.de/10011130047
This is not a research article but an opinion paper that shares insight into the field of performance measurement from both our direct observations and the views of several manufacturing and service companies from the UK and Norway. Data was collected through a survey on the adoption and...
Persistent link: https://www.econbiz.de/10011130129
The purpose of this paper is to present the findings from a case study from a large energy company in terms of what seems to influence the success rate of global projects. While the literature contains much research on success factors in traditional projects, limited findings have emerged when...
Persistent link: https://www.econbiz.de/10011145340
This paper concerns itself with the question of the forces behind privitisation and regulatory reform in local public transport in Europe. Two different approaches to the explanation of the changes are presented: the political and the economic. The paper gives a review of current discussions and...
Persistent link: https://www.econbiz.de/10005236086
This paper describes a method for apportioning contingency in a probabilistic network. It distinguishes between two requirements for contingency: for high variance crucial activities, and for high float noncritical activities. This enables a logical two-step apportionment, the first based upon...
Persistent link: https://www.econbiz.de/10005445670
In a production-inventory system, the manufacturer produces the items at a rate, e.g. R, dispatches the order quantities to the customers in specific intervals and stores the excess inventory for subsequent deliveries. Therefore each inventory cycle of the manufacturer can be divided into two...
Persistent link: https://www.econbiz.de/10011116422
The use of networks handling uncertainty to provide a temporal risk analysis of projects is now widespread. However, such analyses frequently give rise to very wide probability distributions, and thus in practice are described as not credible. This is largely because the simulations do not...