Showing 1 - 10 of 18
Problems of loading, unloading and premarshalling of stacks as well as combinations thereof appear in several practical applications, e.g. container terminals, container ship stowage planning, tram depots or steel industry. Although these problems seem to be different at first sight, they hold...
Persistent link: https://www.econbiz.de/10011097813
In this paper we present complexity results for flow shop problems with synchronous movement which are a variant of a non-preemptive permutation flow shop. Jobs have to be moved from one machine to the next by an unpaced synchronous transportation system, which implies that the processing is...
Persistent link: https://www.econbiz.de/10011117508
A polynomial algorithm is proposed for two scheduling problems for which the complexity status was open. A set of jobs with unit processing times, release dates and outtree precedence relations has to be processed on parallel identical machines such that the total completion time ∑ C j is...
Persistent link: https://www.econbiz.de/10010847527
Problems with unit execution time tasks and two identical parallel processors have received a great deal of attention in scheduling theory. In contrast to the conventional models, where each task requires only one processor, we consider a situation when a task may require both processors...
Persistent link: https://www.econbiz.de/10010847568
Problems with unit execution time tasks and two identical parallel processors have received a great deal of attention in scheduling theory. In contrast to the conventional models, where each task requires only one processor, we consider a situation when a task may require both processors...
Persistent link: https://www.econbiz.de/10010949999
A polynomial algorithm is proposed for two scheduling problems for which the complexity status was open. A set of jobs with unit processing times, release dates and outtree precedence relations has to be processed on parallel identical machines such that the total completion time ∑ C <Subscript>j</Subscript> is...</subscript>
Persistent link: https://www.econbiz.de/10010999571
In this paper we study the single-machine problem 1|chains(l), p <Subscript> j </Subscript>=p|∑ C <Subscript> j </Subscript> in which jobs with constant processing times and generalized precedence constraints in form of chains with constant delays are given. One has to schedule the jobs on a single machine such that all delays between...</subscript></subscript>
Persistent link: https://www.econbiz.de/10010999926
Persistent link: https://www.econbiz.de/10005094947
In this paper we consider a sports league scheduling problem which occurs in planning non-professional table-tennis leagues. The problem consists in finding a schedule for a time-relaxed double round robin tournament where different hard and soft constraints have to be taken into account. We...
Persistent link: https://www.econbiz.de/10005023363
Generating a sports league schedule is a challenging task due to the variety of different requirements which have to be addressed. This has led to a multitude of alternative approaches. Most of them rely on graph-theoretical concepts and the solution of the overall problem is based on the...
Persistent link: https://www.econbiz.de/10005336184