Showing 1 - 10 of 22
We consider a retailer with one radio frequency identification (RFID) enabled supplier and one non-RFID enabled supplier. Assuming vendor managed inventory, we address the problem of allocation and pricing of the retail shelf-space. Using a Stackelberg game where the retailer leads, we observe...
Persistent link: https://www.econbiz.de/10005543625
We consider a retailer with one radio frequency identification (RFID) enabled supplier and one non-RFID enabled supplier. Assuming vendor managed inventory, we address the problem of allocation and pricing of the retail shelf-space. Using a Stackelberg game where the retailer leads, we observe...
Persistent link: https://www.econbiz.de/10008539524
Although uncertainty is rife in many project management contexts, little is known about adaptively optimizing project schedules. We formulate the problem of adaptively optimizing the expected present value of a project's cash flow, and we show that it is practical to perform the optimization....
Persistent link: https://www.econbiz.de/10004973633
This paper considers the pricing decisions and two-tier advertising levels between one manufacturer and one retailer where customer demand depends on the retail price and advertisement by a manufacturer and a retailer. We solve a Stackelberg game with the manufacturer as the leader and the...
Persistent link: https://www.econbiz.de/10005151781
We study the affect on manufacturers and retailers of attaching radio frequency identification (RFID) tags at the item level in a vendor managed inventory (VMI) system. Our model has one manufacturer and one retailer. We first study the demand processes between an RFID system which uses...
Persistent link: https://www.econbiz.de/10005318461
Persistent link: https://www.econbiz.de/10005283769
Recent approaches to modeling the client's payment-scheduling problem allow the client to control both the timing of payments and the completion times of activities. In practice, the activity schedule is typically determined by the contractor rather than the client. This paper addresses this...
Persistent link: https://www.econbiz.de/10009197853
We consider project scheduling where the project manager’s objective is to minimize the time from when an adversary discovers the project until the completion of the project. We analyze the complexity of the problem identifying both polynomially solvable and NP-hard versions of the problem....
Persistent link: https://www.econbiz.de/10011097801
Demand volatility and production lead time oblige manufacturers of made-to-stock goods to use economic forecasts in deciding on production quantities. Manufacturers of finitely durable goods face an additional complication—in making production decisions, they must consider not only the...
Persistent link: https://www.econbiz.de/10011043255
We consider the work flow in a medical teaching facility, examining the process that involves an initial patient exam by a resident physician, a subsequent conference between the resident and the attending physician, and the attending physician's visit with the patient. We create an analytical...
Persistent link: https://www.econbiz.de/10010630512