Showing 1 - 10 of 22
Two variants of genetic algorithm (GA) for solving the Supply Management Problem with Lower-Bounded Demands (SMPLD) are proposed and experimentally tested. The SMPLD problem consists in planning the shipments from a set of suppliers to a set of customers minimizing the total cost, given lower...
Persistent link: https://www.econbiz.de/10005094971
In this paper, a new transfer line balancing problem is considered. The main difference from the simple assembly line balancing problem is that the operations are grouped into blocks (batches). All the operations of the same block are carried out simultaneously by one piece of equipment...
Persistent link: https://www.econbiz.de/10005236902
We study an optimal design problem for serial machining lines. Such lines consist of a sequence of stations. At every station, the operations to manufacture a product are grouped into blocks. The operations within each block are performed simultaneously by the same spindle head and the blocks of...
Persistent link: https://www.econbiz.de/10005287628
Persistent link: https://www.econbiz.de/10005283674
Persistent link: https://www.econbiz.de/10009404456
Persistent link: https://www.econbiz.de/10005417777
In this paper, a discrete single-level multi-component inventory control model for assembly systems with random component procurement lead times is considered. The economic order quantity (EOQ) policy is used for a type of finished product. The requirements of the components are constant and...
Persistent link: https://www.econbiz.de/10004973560
This study deals with Material Requirement Planning (MRP) software parameterization under uncertainties. The actual lead time has random deviations; so it can be considered as a random variable. MRP approach with Periodic Order Quantity (POQ) policy is considered. The aim is to find the optimal...
Persistent link: https://www.econbiz.de/10010869112
Line balancing belongs to a class of intensively studied combinatorial optimization problems known to be NP-hard in general. For several decades, the core problem originally introduced for manual assembly has been extended to suit robotic, machining and disassembly contexts. However, despite...
Persistent link: https://www.econbiz.de/10011043245
The problem of MRP offsetting for assembly systems with random component procurement times is considered. POQ policy is used for the case where all components have identical lead time distributions and holding costs. An analytical optimization model is proposed and solved. This model minimizes...
Persistent link: https://www.econbiz.de/10010580555