The resource-constrained project scheduling problem (RCPSP) consists of activities that must be scheduled subject to precedence and resource constraints such that the makespan is minimized. It has become a well-known standard problem in the context of project scheduling which has attracted...
Persistent link: https://www.econbiz.de/10008865188
The resource-constrained project scheduling problem (RCPSP) consists of activities that must be scheduled subject to precedence and resource constraints such that the makespan is minimized. It has become a well-known standard problem in the context of project scheduling which has attracted...
Persistent link: https://www.econbiz.de/10009018234
This paper discusses the scheduling of reefer mechanics at container terminals. Reefer mechanics plug and unplug reefer containers such that due times are met. We outline the resulting scheduling problem and two simple heuristics. Subsequently, we present a simulation model to analyze the...
Persistent link: https://www.econbiz.de/10011048980
This contribution presents a simulation model that generates arrivals of ships over time at a container terminal. The model includes a quay of limited capacity, a decision module for assigning berths to ships, and a queue for ships for which currently no berth is available. Such models are...
Persistent link: https://www.econbiz.de/10008728032
Persistent link: https://www.econbiz.de/10008517460
Persistent link: https://www.econbiz.de/10008576389
This paper discusses an extension of the classical resource-constrained project scheduling problem (RCPSP) in which the resource availability as well as the resource request of the activities may change from period to period. While the applicability of this extension should be obvious, we...
Persistent link: https://www.econbiz.de/10009018235
The capacity of a runway system represents a bottleneck at many international airports. The current practice at airports is to land approaching aircraft on a first-come, first-served basis. An active rescheduling of aircraft landing times increases runway capacity or reduces delays. The problem...
Persistent link: https://www.econbiz.de/10011190754
Bin packing problems are at the core of many well-known combinatorial optimization problems and several practical applications alike. In this work we introduce a novel variant of an abstract bin packing problem which is subject to a chaining constraint among items. The problem stems from an...
Persistent link: https://www.econbiz.de/10010950175
A single round robin tournament (RRT) consists of a set T of n teams (n even) and a set P of n - 1 periods. The teams have to be scheduled such that each team plays exactly once against each other team and such that each team plays exactly once per period. In order to establish fairness...