Showing 1 - 7 of 7
In this paper, we address the backlog sequencing problem in a flow-shop controlled by a CON\VIP production control system with the objective to minimise the make span We characterise the problem and analyse its similarities and differences with the permutation flow-shop problem A comparison of...
Persistent link: https://www.econbiz.de/10009283676
Persistent link: https://www.econbiz.de/10005240723
Persistent link: https://www.econbiz.de/10005340067
Persistent link: https://www.econbiz.de/10005257149
Persistent link: https://www.econbiz.de/10005278160
Persistent link: https://www.econbiz.de/10005188796
Persistent link: https://www.econbiz.de/10005188839