Showing 1 - 10 of 1,080
: In this paper we describe the use of a set covering model with additional constraints for scheduling train drivers and conductors for the Dutch railway operator NS Reizigers. The schedules were generated according to new rules originating from the project "Destination: Customer" ("Bestemming:...
Persistent link: https://www.econbiz.de/10010731013
Real-time railway operations are subject to stochastic disturbances. However, a railway timetable is a deterministic plan. Thus a timetable should be designed in such a way that it can cope with the stochastic disturbances as well as possible. For that purpose, a timetable usually contains time...
Persistent link: https://www.econbiz.de/10011122696
In this paper, we give an overview of state-of-the-art Operations Research models and techniques used in passenger railway transportation. For each planning phase (strategic, tactical and operational), we describe the planning problems arising there and discuss some models and algorithms to...
Persistent link: https://www.econbiz.de/10010730915
Real-time railway operations are subject to stochastic disturbances. However, a railway timetable is a deterministic plan. Thus a timetable should be designed in such a way that it can absorb the stochastic disturbances as well as possible. To that end, a timetable contains buffer times between...
Persistent link: https://www.econbiz.de/10010731135
Reliability is one of the key factors in transportation, both for passengers and for cargo. This paper examines reliability in public railway systems. Reliability of railway services is a complex matter, since there are many causes for disruptions and at least as many causes for delays to spread...
Persistent link: https://www.econbiz.de/10010731209
For a commercially operating railway company, providing a high level of service for the passengers is of utmost importance. The latter requires a high punctuality of the trains and an adequate rolling stock capacity. Unfortunately, the latter is currently (2002) one of the bottlenecks in the...
Persistent link: https://www.econbiz.de/10010731375
In December 2006, Netherlands Railways introduced a completely new timetable. Its objective was to facilitate the growth of passenger and freight transport on a highly utilized railway network, and improve the robustness of the timetable resulting in less train delays in the operation. Further...
Persistent link: https://www.econbiz.de/10011149274
Traditional rolling stock rescheduling applications either treat passengers as static objects whose influence on the system is unchanged in a disrupted situation, or they treat passenger behavior as a given input. In case of disruptions however, we may expect the flow of passengers to change...
Persistent link: https://www.econbiz.de/10011122695
Urban Public Transport systems must periodically close certain links for main- tenance, which can have significant effects on the service provided to passengers. In practice, the effects of closures are mitigated by replacing the link with a simple shuttle service. However, alternative shuttle...
Persistent link: https://www.econbiz.de/10011122697
This paper addresses the Rolling Stock Rescheduling Problem (RSRP), while taking maintenance appointments into account. After a disruption, the rolling stock of passenger trains has to be rescheduled in order to maintain a feasible rolling stock circulation. A limited number of rolling stock...
Persistent link: https://www.econbiz.de/10011183089