Showing 1 - 10 of 16
The overall objective of this work is to identify the effects of climate change on the Norwegian energy system towards 2050. Changes in the future wind- and hydro-power resource potential, and changes in the heating and cooling demand are analysed to map the effects of climate change. The impact...
Persistent link: https://www.econbiz.de/10011046731
The EU renewable energy (RES) directive sets a target of increasing the share of renewable energy used in the EU to 20% by 2020. The Norwegian goal for the share of renewable energy in 2020 is 67.5%, an increase from 60.1% in 2005. The Norwegian power production is almost solely based on...
Persistent link: https://www.econbiz.de/10010681919
We present a supply chain design problem modeled as a sequence of splitting and combining processes. We formulate the problem as a two-stage stochastic program. The first-stage decisions are strategic location decisions, whereas the second stage consists of operational decisions. The objective...
Persistent link: https://www.econbiz.de/10004973535
Natural gas flows in pipelines as a consequence of the pressure difference at the inlet and outlet. Adjusting these pressures makes it possible to inject natural gas at one rate and withdraw at a different rate, hence using the pipeline as storage as well as transport. We study the value of...
Persistent link: https://www.econbiz.de/10011111228
Branch and Fix Coordination is an algorithm intended to solve large scale multi-stage stochastic mixed integer problems, based on the particular structure of such problems, so that they can be broken down into smaller subproblems. With this in mind, it is possible to use distributed computation...
Persistent link: https://www.econbiz.de/10011209364
We present a modeling framework for analyzing if the use of interruptible transportation services can improve capacity utilization in a natural gas transportation network. The network consists of two decision makers: the transmission system operator (TSO) and a shipper of natural gas. The TSO is...
Persistent link: https://www.econbiz.de/10011209405
Infrastructure-planning models are challenging because of their combination of different time scales: while planning and building the infrastructure involves strategic decisions with time horizons of many years, one needs an operational time scale to get a proper picture of the...
Persistent link: https://www.econbiz.de/10010846147
The stochastic pooling problem is a type of stochastic mixed-integer bilinear program arising in the integrated design and operation of various important industrial networks, such as gasoline blending, natural gas production and transportation, water treatment, etc. This paper presents a...
Persistent link: https://www.econbiz.de/10010994057
Persistent link: https://www.econbiz.de/10004995452
Persistent link: https://www.econbiz.de/10008486925