Showing 1 - 2 of 2
A two-machine flow shop scheduling problem with rejection is considered in this paper. The objective is to minimize the sum of makespan of accepted operations and total penalty of rejected operations. Each job has two operations that could be rejected, respectively. Operations on the first...
Persistent link: https://www.econbiz.de/10011010818
Bi0.95La0.05FeO3(BLFOx=0.05) film was fabricated on indium tin oxide/glass substrate using a metal organic decomposition method. No secondary phase can be observed in the well crystallized and predominantly (110)-oriented BLFOx=0.05 film. Well-saturated P - E hysteresis loops with the remanent...
Persistent link: https://www.econbiz.de/10008481940