Showing 1 - 10 of 27
Persistent link: https://www.econbiz.de/10005337560
Persistent link: https://www.econbiz.de/10005283408
Persistent link: https://www.econbiz.de/10005117867
Persistent link: https://www.econbiz.de/10005347181
Persistent link: https://www.econbiz.de/10005347848
Persistent link: https://www.econbiz.de/10005355085
Persistent link: https://www.econbiz.de/10005240883
Persistent link: https://www.econbiz.de/10005257147
Persistent link: https://www.econbiz.de/10005283497
The two management set parameters which determine the performance of a material requirements planning (MRP) system are the lead time and the safety stock. The appropriate values of these parameters are influenced by the accuracy of forecasts over the lead time, the variability of processing time...
Persistent link: https://www.econbiz.de/10009204187