Showing 1 - 10 of 11
Persistent link: https://www.econbiz.de/10010477689
Persistent link: https://www.econbiz.de/10010338558
Persistent link: https://www.econbiz.de/10013366445
Persistent link: https://www.econbiz.de/10014303887
This paper considers the problem of scheduling operations in bufferless robotic cells that produce identical parts. Finding a cyclic solution that minimizes the long-run average time to produce a part has long been a fundamental open problem. Most research has been focused on finding an optimal...
Persistent link: https://www.econbiz.de/10014138523
In a two-stage serial supply chain, a periodic flexible policy (PF policy) allows the retailer to receive fixed orders that may depend on demand history in one period of the ordering cycle and order freely in other periods. Existing literature has shown that certain PF policies can significantly...
Persistent link: https://www.econbiz.de/10012947675
We discuss the performance of scheduling algorithms for a certain kind of manufacturing environment, called the "Flexible Flowshop", which consists of a certain number of machine centers. Each center has one or more identical parallel machines. Each part is processed by at most one machine in...
Persistent link: https://www.econbiz.de/10014219051
We study the recently identified class of generalized due date scheduling problems. These are machine scheduling problems for which due dates are specified according to the position in which a job is completed, rather than the identity of that job. Flexible manufacturing environments and public...
Persistent link: https://www.econbiz.de/10012746788
We study the problem of minimizing makespan in a two-machine job shop with unit processing time operations. An efficient algorithm with respect to a succinct encoding of the problem instances is proposed. The algorithm is an improvement of earlier algorithms proposed for the problem by Brucker [...
Persistent link: https://www.econbiz.de/10012746789
Job shop scheduling with a bank of machines in parallel is important from both theoretical and practical points of review. Here we focus on a flexible job shop scheduling problem of minimizing the makespan in a two-center job shop, where the first center consists of one machine and the second...
Persistent link: https://www.econbiz.de/10012838656