Showing 1 - 10 of 13
Persistent link: https://www.econbiz.de/10003957495
Persistent link: https://www.econbiz.de/10001735561
Recently, time-switch constraints have been introduced in literature by Yang and Chen (2000). Basically, these constraints impose a specified starting time on the project activities and force them to be inactive during specified time periods. This type of constraints have been incorporated into...
Persistent link: https://www.econbiz.de/10014105801
Persistent link: https://www.econbiz.de/10010351873
Persistent link: https://www.econbiz.de/10010493492
Persistent link: https://www.econbiz.de/10003210606
Persistent link: https://www.econbiz.de/10011458355
Persistent link: https://www.econbiz.de/10012495409
Persistent link: https://www.econbiz.de/10014560649
Persistent link: https://www.econbiz.de/10014283009