Showing 1 - 10 of 11
Persistent link: https://www.econbiz.de/10003961629
Persistent link: https://www.econbiz.de/10011641469
Persistent link: https://www.econbiz.de/10012125309
Persistent link: https://www.econbiz.de/10014265739
Persistent link: https://www.econbiz.de/10009761277
Persistent link: https://www.econbiz.de/10008699007
A companion paper (Part I) considers the problem of minimizing the weighted earliness and tardiness of jobs scheduled on a single machine around a common due date, d, which is unrestrictively late. This paper (Part II) considers the problem of minimizing the unweighted earliness and tardiness of...
Persistent link: https://www.econbiz.de/10012746786
We study the problem of minimizing makespan in a two-machine job shop with unit processing time operations. An efficient algorithm with respect to a succinct encoding of the problem instances is proposed. The algorithm is an improvement of earlier algorithms proposed for the problem by Brucker [...
Persistent link: https://www.econbiz.de/10012746789
Job shop scheduling with a bank of machines in parallel is important from both theoretical and practical points of review. Here we focus on a flexible job shop scheduling problem of minimizing the makespan in a two-center job shop, where the first center consists of one machine and the second...
Persistent link: https://www.econbiz.de/10012838656
Chapter 1: Preliminaries -- Chapter 2: Makespan minimization for two-machine open shops -- Chapter 3: General open shop scheduling -- Chapter 4: Multiprocessor operations -- Chapter 5: Concurrent open shops -- Chapter 6: Open shop scheduling with simultaneity constraints -- Chapter 7:...
Persistent link: https://www.econbiz.de/10012814734