Showing 1 - 10 of 20
Persistent link: https://www.econbiz.de/10009379486
Persistent link: https://www.econbiz.de/10003591464
The m-machine, n-job, permutation flowshop problem with the total tardiness objective is a common scheduling problem …
Persistent link: https://www.econbiz.de/10014039527
The paper makes an attempt to minimize the makespan and total tardiness in the flow shop scheduling using Artificial Neural Network (ANN). A feed forward back propagation neural network is implemented for the optimal solution of the problem. The network has been trained with the optimal...
Persistent link: https://www.econbiz.de/10014114124
Transshipments, monitored movements of material at the same echelon of a supply chain, represent an effective pooling mechanism. With a single exception, research on transshipments overlooks replenishment lead times. The only approach for two-location inventory systems with non-negligible lead...
Persistent link: https://www.econbiz.de/10012754127
Persistent link: https://www.econbiz.de/10000540231
Persistent link: https://www.econbiz.de/10000052870
Persistent link: https://www.econbiz.de/10000061943
Persistent link: https://www.econbiz.de/10000071700