Additional highway capacity, by increasing travel speed, affects the individual share of time within a 24-hour budget allocated to various activities (time spent at and traveling to home, shop, work and other). Some activities will be undertaken more, others less. This paper extends previous...
Persistent link: https://www.econbiz.de/10012772846
Persistent link: https://www.econbiz.de/10001417539
Empirical data and statistical models are used to answer the question of where the new highway routes are most likely to be located. High-quality land-use, population distribution and highway network GIS data for the Twin Cities Metropolitan Area from 1958 to 1990 are developed for this study....
Persistent link: https://www.econbiz.de/10014224625
This paper examines new highway construction based on the status of the network, traffic demand, project costs, and budget constraints. The data span two decades and consist of descriptions of physical attributes of the network, the construction and expansion history, and average annual daily...
Persistent link: https://www.econbiz.de/10012772867
In this paper we review the theoretical and empirical literature on the cost structure of the provision of intercity highway transportation and specify and estimate our own cost functions . We develop a full cost model which identifies the key cost components and then estimate costs component by...
Persistent link: https://www.econbiz.de/10012772876
This paper examines the growth of a network based on the present conditions of the network, traffic demand, other demographic characteristics, project costs, and a budget constraint. The effects of expanding a link on its upstream and downstream neighbors, as well as on parallel links are also...
Persistent link: https://www.econbiz.de/10012772878
This study aims to determine whether ramp meters increase the capacity of active freeway bottlenecks. The traffic flow characteristics at 27 active bottlenecks in the Twin Cities have been studied for seven weeks without ramp metering and seven weeks with ramp metering. A methodology for...