Showing 1 - 10 of 33
Markov-switching models are usually specified under the assumption that all the parameters change when a regime switch occurs. Relaxing this hypothesis and being able to detect which parameters evolve over time is relevant for interpreting the changes in the dynamics of the series, for...
Persistent link: https://www.econbiz.de/10012956786
Persistent link: https://www.econbiz.de/10010483766
Persistent link: https://www.econbiz.de/10010484019
Persistent link: https://www.econbiz.de/10011704161
We propose an estimation method that circumvents the path dependence problem existing in Change-Point (CP) and Markov Switching (MS) ARMA models. Our model embeds a sticky infinite hidden Markov-switching structure (sticky IHMM), which makes possible a self-determination of the number of regimes...
Persistent link: https://www.econbiz.de/10011094059
Markov-switching models are usually specified under the assumption that all the parameters change when a regime switch occurs. Relaxing this hypothesis and being able to detect which parameters evolve over time is relevant for interpreting the changes in the dynamics of the series, for...
Persistent link: https://www.econbiz.de/10011246294
Persistent link: https://www.econbiz.de/10011589021
Sequential Monte Carlo (SMC) methods are widely used for filtering purposes of non-linear economic or financial models. Nevertheless the SMC scope encompasses wider applications such as estimating static model parameters so much that it is becoming a serious alternative to Markov- Chain...
Persistent link: https://www.econbiz.de/10011506783
We present an estimation and forecasting method, based on a differential evolution MCMC method, for inference in GARCH models subjected to an unknown number of structural breaks at unknown dates. We treat break dates as parameters and determine the number of breaks by computing the marginal...
Persistent link: https://www.econbiz.de/10011116269
GARCH volatility models with fixed parameters are too restrictive for long time series due to breaks in the volatility process. Flexible alternatives are Markov-switching GARCH and change-point GARCH models. They require estimation by MCMC methods due to the path dependence problem. An unsolved...
Persistent link: https://www.econbiz.de/10011052313