Showing 1 - 10 of 20
This paper is devoted to a comparison of all available branch-and-bound algorithms that can be applied to solve resource-constrained project scheduling problems with multiple execution modes for each activity. After summarizing the two exact algorithms that have been suggested in the literature,...
Persistent link: https://www.econbiz.de/10011736626
We consider an extension of the classical resource-constrained project scheduling problem (RCPSP), which covers discrete resource-resource and time-resource tradeoffs. As a result a project scheduler is permitted to identify several alternatives or modes of accomplishment for each activity of...
Persistent link: https://www.econbiz.de/10011743239
In this paper we consider the resource-constrained project scheduling problem with multiple execution modes for each activity and makespan minimization as objective. We present a new genetic algorithm approach to solve this problem. The genetic encoding is based on a precedence feasible sequence...
Persistent link: https://www.econbiz.de/10011736751
This paper introduces a new general framework for genetic algorithms to solve a broad range of optimization problems. When designing a genetic algorithm, there may be several alternatives for a component such as crossover, mutation or decoding procedure, and it may be difficult to determine the...
Persistent link: https://www.econbiz.de/10011734932
Persistent link: https://www.econbiz.de/10011787474
Persistent link: https://www.econbiz.de/10011787477
This paper is devoted to a comparison of all available branch-and-bound algorithms that can be applied to solve resource-constrained project scheduling problems with multiple execution modes for each activity. After summarizing the two exact algorithms that have been suggested in the literature,...
Persistent link: https://www.econbiz.de/10011583012
We consider an extension of the classical resource-constrained project scheduling problem (RCPSP), which covers discrete resource-resource and time-resource tradeoffs. As a result a project scheduler is permitted to identify several alternatives or modes of accomplishment for each activity of...
Persistent link: https://www.econbiz.de/10011613753
The car sequencing problem is to find feasible sequences of product variants requiring specific options while taking care of sequencing constraints. First, a branching scheme and constraint propagation algorithms for the computation of feasible sequences are provided. Second, an algorithm is...
Persistent link: https://www.econbiz.de/10011734528
Persistent link: https://www.econbiz.de/10011806934