Showing 1 - 8 of 8
We consider two linear project time–cost tradeoff problems with multiple milestones. Unless a milestone is completed on time, penalty costs for tardiness may be imposed. However, these penalty costs can be avoided by compressing the processing times of certain jobs that require additional...
Persistent link: https://www.econbiz.de/10010753489
We consider a continuous time–cost tradeoff problem with multiple milestones and completely ordered jobs. If a milestone is tardy, a penalty cost may be imposed. The processing times of jobs can be compressed by additional resources or activities that incur compression costs. The objective is...
Persistent link: https://www.econbiz.de/10011264308
This paper considers a two-machine ordered flow shop problem, where each job is processed through the in-house system or outsourced to a subcontractor. For in-house jobs, a schedule is constructed and its performance is measured by the makespan. Jobs processed by subcontractors require paying an...
Persistent link: https://www.econbiz.de/10010871182
Persistent link: https://www.econbiz.de/10014372788
Persistent link: https://www.econbiz.de/10011289944
Persistent link: https://www.econbiz.de/10011457652
Persistent link: https://www.econbiz.de/10012299988
Persistent link: https://www.econbiz.de/10013272671