Showing 1 - 5 of 5
Persistent link: https://www.econbiz.de/10011721326
Persistent link: https://www.econbiz.de/10010370263
Persistent link: https://www.econbiz.de/10012265260
Persistent link: https://www.econbiz.de/10003828043
This paper addresses the joint quay crane and truck scheduling problem at a container terminal, considering the coordination of the two types of equipment to reduce their idle time between performing two successive tasks. For the unidirectional flow problem with only inbound containers, in which...
Persistent link: https://www.econbiz.de/10011097719