Showing 1 - 3 of 3
Persistent link: https://www.econbiz.de/10011700360
In this study, a feasibility based inexact fuzzy programming approach (FBIFP) was developed and applied to the planning of a regional electric power generation system (REPGS). As an extension of existing interval linear programming and fuzzy linear programming, FBIFP could tackle uncertainties...
Persistent link: https://www.econbiz.de/10010572054
In this study, a dual interval two-stage restricted-recourse programming (DITRP) method is developed for flood-diversion planning under uncertainty. Compared with other conventional methods, DITRP improves upon them by addressing system uncertainties with complex presentations and incorporating...
Persistent link: https://www.econbiz.de/10010847418