Showing 1 - 2 of 2
Lot sizing and scheduling problems arise when a variety of products are manufactured in a plant of finite capacity in which a single product variant at one time can be manufactured, and changeover costs (and/or times) depend on the products scheduling sequence. MIP models developed to solve...
Persistent link: https://www.econbiz.de/10010580580
Persistent link: https://www.econbiz.de/10009682508