Showing 1 - 10 of 1,670
Persistent link: https://www.econbiz.de/10011387583
Persistent link: https://www.econbiz.de/10011916650
We analyze a W-configuration assemble-to-order system with random lead times, random arrival of demand, and lost sales, in continuous time. Specifically, we assume exponentially distributed production and demand inter-arrival times. We formulate the problem as an infinite-horizon Markov decision...
Persistent link: https://www.econbiz.de/10013310944
Persistent link: https://www.econbiz.de/10011496676
Persistent link: https://www.econbiz.de/10003918122
Persistent link: https://www.econbiz.de/10009689264
Persistent link: https://www.econbiz.de/10003882894
Persistent link: https://www.econbiz.de/10011489713
Persistent link: https://www.econbiz.de/10010381850
Persistent link: https://www.econbiz.de/10010492368