Showing 1 - 10 of 49
. These uncertainties include future economic and load growths, fuel prices, environmental regulations, economic regulations …
Persistent link: https://www.econbiz.de/10009436372
The analysis and modeling of investment behavior in the development of hydrothermal electric power facilities are reported. This investment behavior reflects a degree of sensitivity to public policy alternatives concerning taxation and regulation of the resource and its related energy conversion...
Persistent link: https://www.econbiz.de/10009436469
In this paper, I offer some thoughts about least cost planning, not from the perspective of the regulator or utility, but from the perspective of a residential customer. The problem that I address is, as a homeowner in northern Virginia, I am about to make a long term fuel choice for my...
Persistent link: https://www.econbiz.de/10009437305
This presentation uses a vehicle simulator and economics model called the Battery Ownership Model to examine the …
Persistent link: https://www.econbiz.de/10009435488
accrue only in a ''build'' situation. In particular, possible economic advantages of public utility ownership include: (1 … assess the levelized cost of electricity under four supply options: (1) public utility ownership of new geothermal capacity …, (2) public utility ownership of new wind capacity, (3) a PPA for new geothermal capacity, and (4) a PPA for new wind …
Persistent link: https://www.econbiz.de/10009435943
Electric vehicles could significantly reduce greenhouse gas (GHG) emissions and dependence on imported petroleum. However, for mass adoption, EV costs have historically been too high to be competitive with conventional vehicle options due to the high price of batteries, long refuel time, and a...
Persistent link: https://www.econbiz.de/10009436189
financial incentives: over time and by system size, component, state, system ownership type (customer-owned vs. third party …
Persistent link: https://www.econbiz.de/10009436285
The purpose of the Financial Analysis for Phase 1 Privatization for the Tank Farm Contractor is to provide a third-party quantitative and qualitative cost and schedule risk analysis of HNF-1946. The purpose of this Financial Analysis for Phase 1 Privatization for the Tank Farm Contractor (TFC)...
Persistent link: https://www.econbiz.de/10009436304
This report reviews recent global efforts to privatize energy resources and outlines the opportunities and challenges privatization has presented to U.S. and foreign multinational energy companies. The group of energy companies studied in this report includes the major U.S. petroleum companies...
Persistent link: https://www.econbiz.de/10009436410
ownership of the renewable and environmental attributes of renewable electricity generation. In recent years, however, questions …
Persistent link: https://www.econbiz.de/10009436852