Showing 1 - 10 of 11
This paper estimates the long run elasticity of the demand for fixed nonresidential capital (both equipment and structures) to changes in its user cost using a quarterly panel of two-digit manufacturing data from South Africa from 1970 to 2001. Using a difference specification that does not rely...
Persistent link: https://www.econbiz.de/10014225410
We use a large project-level dataset to estimate the length of the planning period for commercial construction projects in the United States. We find that these time-to-plan lags are long, averaging about 17 months when we aggregate the projects without regard to size and more than 28 months...
Persistent link: https://www.econbiz.de/10013104535
We use a large project-level dataset to estimate the length of the planning period for commercial construction projects in the United States. We find that these time-to-plan lags are long, averaging about 17 months when we aggregate the projects without regard to size and more than 28 months...
Persistent link: https://www.econbiz.de/10013086948
We use a large project-level dataset to estimate the length of the planning period for commercial construction projects in the United States. We find that these time-to-plan lags are long, averaging about 17 months when we aggregate the projects without regard to size and more than 28 months...
Persistent link: https://www.econbiz.de/10013063051
Persistent link: https://www.econbiz.de/10010188588
Persistent link: https://www.econbiz.de/10009570223
Persistent link: https://www.econbiz.de/10011638844
Persistent link: https://www.econbiz.de/10015180167
Using panel data of 192 countries from 1970 through 1999, and 195 currency crisis episodes, this study examines the effect of membership in a currency union on the probability of experiencing a currency crisis. Both parametric and non-parametric estimates suggest that membership in a currency...
Persistent link: https://www.econbiz.de/10013160054
Persistent link: https://www.econbiz.de/10003380184