Showing 1 - 10 of 2,093
Persistent link: https://www.econbiz.de/10010361780
Persistent link: https://www.econbiz.de/10011969051
In this paper we address the scheduling problem that comes from an ice cream manufacturing company. This production system can be modelled as a three stage nowait hybrid flow shop with batch dependent setup costs. To contribute reducing the gap between theory and practice we have considered the...
Persistent link: https://www.econbiz.de/10011898585
Persistent link: https://www.econbiz.de/10010228339
Persistent link: https://www.econbiz.de/10010425024
Persistent link: https://www.econbiz.de/10009575431
Persistent link: https://www.econbiz.de/10011649395
Persistent link: https://www.econbiz.de/10015097339
Persistent link: https://www.econbiz.de/10014230359
Persistent link: https://www.econbiz.de/10010187258