Showing 1 - 10 of 15
Persistent link: https://www.econbiz.de/10014265686
Persistent link: https://www.econbiz.de/10014381007
Persistent link: https://www.econbiz.de/10009685686
Persistent link: https://www.econbiz.de/10011401272
Persistent link: https://www.econbiz.de/10009625625
This paper considers a three-stage assembly flowshop scheduling problem with sequence-dependent setup times at the first stage and blocking times between each stage in such a way that the weighted mean completion time and makespan are minimized. Obtaining an optimal solution for this type of...
Persistent link: https://www.econbiz.de/10009758825
We consider an open shop scheduling problem with setup and processing times separately such that not only the setup times are dependent on the machines, but also they are dependent on the sequence of jobs that should be processed on a machine. A novel bi-objective mathematical programming is...
Persistent link: https://www.econbiz.de/10009758826
This paper presents a multi-objective mixed-integer nonlinear programming model to design a group layout of a cellular manufacturing system in a dynamic environment, in which the number of cells to be formed is variable. Cell formation (CF) and group layout (GL) are concurrently made in a...
Persistent link: https://www.econbiz.de/10009759157
Persistent link: https://www.econbiz.de/10010424867
Persistent link: https://www.econbiz.de/10003470668