Showing 1 - 10 of 10
Persistent link: https://www.econbiz.de/10003470658
Persistent link: https://www.econbiz.de/10003470642
Persistent link: https://www.econbiz.de/10003470668
Persistent link: https://www.econbiz.de/10010240598
Persistent link: https://www.econbiz.de/10009685686
Mixed-model assembly lines are increasingly accepted in many industrial environments to meet the growing trend of greater product variability, diversification of customer demands, and shorter life cycles. In this research, a new mathematical model is presented considering balancing a mixed-model...
Persistent link: https://www.econbiz.de/10011565314
Persistent link: https://www.econbiz.de/10012619414
Persistent link: https://www.econbiz.de/10012229957
This paper considers a three-stage assembly flowshop scheduling problem with sequence-dependent setup times at the first stage and blocking times between each stage in such a way that the weighted mean completion time and makespan are minimized. Obtaining an optimal solution for this type of...
Persistent link: https://www.econbiz.de/10009758825
Persistent link: https://www.econbiz.de/10003794896