Showing 1 - 8 of 8
Persistent link: https://www.econbiz.de/10001247493
Persistent link: https://www.econbiz.de/10001209348
Persistent link: https://www.econbiz.de/10001199344
Persistent link: https://www.econbiz.de/10012040727
In this paper, a scaled independent component analysis (sICA) method is proposed for finding potential factors with more predictive power. The core idea is to improve the predictive effect of the model by giving more weight to those variables with stronger predictive power before estimating the...
Persistent link: https://www.econbiz.de/10014079136
In order to regulate work in process (WIP) to the desired value in the job shop production control system, capacity adjustment as an effective and efficient measure, which is typically achieved by flexible staffs and working time. In this paper, instead of traditional labour-oriented approaches,...
Persistent link: https://www.econbiz.de/10014382676
Persistent link: https://www.econbiz.de/10014543936
Persistent link: https://www.econbiz.de/10014286507