Showing 1 - 10 of 10
Persistent link: https://www.econbiz.de/10000834913
Persistent link: https://www.econbiz.de/10000809533
Persistent link: https://www.econbiz.de/10000899849
Persistent link: https://www.econbiz.de/10000859767
A structural model is developed and estimated by a maximum likelihood routine to investigate interrelated factor demand subject to nonconvex adjustment costs. The dataset concerns Norwegian plants operating in manufacturing industries and it covers the period 1993-2005. The estimates indicate...
Persistent link: https://www.econbiz.de/10013135185
A structural model is developed and estimated by a maximum likelihood routine to investigate interrelated factor demand subject to nonconvex adjustment costs. The dataset concerns Norwegian plants operating in manufacturing industries and it covers the period 1993-2005. The estimates indicate...
Persistent link: https://www.econbiz.de/10013135325
In order to explain cyclical behaviour of factor demand, the static neo-classical model of the firm has been extended to include either adjustment costs (e.g. Lucas (1967)) or time-to-build considerations as in Kydland and Prescott (1982). This paper presents an intertemporal factor demand model...
Persistent link: https://www.econbiz.de/10013124016
Persistent link: https://www.econbiz.de/10010470524
A structural model is developed and estimated by a maximum likelihood routine to investigate interrelated factor demand subject to nonconvex adjustment costs. The dataset concerns Norwegian plants operating in manufacturing industries and it covers the period 1993-2005. The estimates indicate...
Persistent link: https://www.econbiz.de/10009312924
Persistent link: https://www.econbiz.de/10013452763