Showing 1 - 2 of 2
Persistent link: https://www.econbiz.de/10014484642
One policy that is believed to increase the rate of innovation and the level of productivity is to move from Design-bid-build contracts (DBB) to Design-Build contracts (DB). A common view is that the latter provides the contractor more degrees of freedom to enable innovation. This hypothesis...
Persistent link: https://www.econbiz.de/10010945092