Showing 1 - 9 of 9
We propose an extension to the flow shop scheduling problem named Heterogeneous Flow Shop Scheduling Problem (Het-FSSP), where two simultaneous issues have to be resolved: finding the best worker assignment to the workstations, and solving the corresponding scheduling problem. This problem is...
Persistent link: https://www.econbiz.de/10011097742
Persistent link: https://www.econbiz.de/10010379952
Persistent link: https://www.econbiz.de/10008657793
Persistent link: https://www.econbiz.de/10003835503
Persistent link: https://www.econbiz.de/10011341394
Persistent link: https://www.econbiz.de/10011869439
Persistent link: https://www.econbiz.de/10013383677
Persistent link: https://www.econbiz.de/10014565004
Persistent link: https://www.econbiz.de/10013535805