Showing 1 - 10 of 20
In this paper we introduce an extension of the well known Rural Postman Problem, which combines arc routing with profits and facility location. Profitable arcs must be selected, facilities located at both end-points of the selected arcs, and a tour identified so as to maximize the difference...
Persistent link: https://www.econbiz.de/10011097829
Persistent link: https://www.econbiz.de/10010401640
Persistent link: https://www.econbiz.de/10010373865
Persistent link: https://www.econbiz.de/10003757305
Persistent link: https://www.econbiz.de/10011428997
Persistent link: https://www.econbiz.de/10012161807
Persistent link: https://www.econbiz.de/10001299226
Persistent link: https://www.econbiz.de/10003990174
Persistent link: https://www.econbiz.de/10011326910
Persistent link: https://www.econbiz.de/10011410058