Showing 1 - 2 of 2
Productivity is often computed by approximating the weighted sum of the inputs from the estimation of the Cobb-Douglas production function. Such estimates, however, may suffer from simultaneity and selection biases. Olley and Pakes (1996) introduced a semi-parametric method which allows us to...
Persistent link: https://www.econbiz.de/10010839235
Persistent link: https://www.econbiz.de/10010535903