Showing 1 - 2 of 2
Over the past decade, JIT approach for designing and operating lines has evolved to compete on time dimensions. Traditionally, the lines designed and operated using line balancing approach are considered optimal. Uses simulation methodology to compare each of these approaches under various...
Persistent link: https://www.econbiz.de/10014790543
Over the past decade two approaches, just‐in‐time (JIT) and theory of constraints (TOC), for designing and operating production lines have developed, each claiming to be the “correct” way. In addition there are still those who maintain that line balanced (whenever possible) is the...
Persistent link: https://www.econbiz.de/10014790672