Showing 1 - 10 of 292
Persistent link: https://www.econbiz.de/10001599298
Persistent link: https://www.econbiz.de/10002513233
Persistent link: https://www.econbiz.de/10003086384
Persistent link: https://www.econbiz.de/10002240098
This paper introduces a framework for joint hub network development. Building a joint physical hub for transhipment of goods is expensive and therefore involves considerable risks for the cooperating companies. In a practical setting, it is unlikely that an entire network will be built at once....
Persistent link: https://www.econbiz.de/10014223600
This paper considers one machine job scheduling situations or sequencing problems, where clients can have more than a single job to be processed in order to get a final output. Moreover, a job can be of interest for different players. This means that one of the main assumptions in classic...
Persistent link: https://www.econbiz.de/10014028825
This paper analyzes a single-machine scheduling problem with family setup times both from an optimization and a cost allocation perspective. In a so-called family sequencing situation jobs are processed on a single machine, there is an initial processing order on the jobs, and every job within a...
Persistent link: https://www.econbiz.de/10013106485
This paper introduces a new class of interactive cooperative purchasing situations and provides an explicit alternative characterization of the nucleolus of cooperative games, which offers an alternative to Kohlberg (1971). In our cooperative purchasing situation, the unit price of a commodity...
Persistent link: https://www.econbiz.de/10013107420
Persistent link: https://www.econbiz.de/10010205336
Persistent link: https://www.econbiz.de/10009777783