Showing 1 - 10 of 301
We consider a production-inventory planning problem with time-varying demands, convex production costs and a warehouse capacity constraint. It is solved by use of the Lagrangian form of the maximum principle. The possible existence of strong decision and forecast horizons is demonstrated. When...
Persistent link: https://www.econbiz.de/10014046438
This paper proposes a new methodology to solve partially observed inventory problems. Generally, these problems have infinite dimensional states that are conditional distribution of the inventory level. Our methodology involves linearizing the state transitions via unnormalized probabilities. It...
Persistent link: https://www.econbiz.de/10012846527
We consider two control problems on a finite horizon; one stochastic and the other deterministic. In both problems the running cost and the terminal cost are the same. The controllable input in both problems is of an additive nature with cost proportional to the input (which can be both positive...
Persistent link: https://www.econbiz.de/10012833274
Two types of quantity discounts are treated in the literature, namely, 'all units' discounts and incremental quantity discounts. In the all units quantity discounts model. the discount applies to every unit purchased. As a result, the total purchase cost is a discontinuous function of the...
Persistent link: https://www.econbiz.de/10012834409
This paper summarizes the results of its detailed version, which considers optimal infinite horizon stochastic production planning problems with capacity and demand to be finite state Markov chains. Turnpike set concepts are introduced to characterize the optimal inventory levels. It is shown...
Persistent link: https://www.econbiz.de/10012834925
This paper presents a state-of-the-art review of asymptotic analyses of hierarchical manufacturing systems with stochastic demand and machines subject to breakdown and repair. The rate of change in machine states is much larger than the rate of fluctuation in demand and the rate of discounting...
Persistent link: https://www.econbiz.de/10012835064
We consider a problem of controlling the production rate of a single machine, single product, stochastic manufacturing system in order to minimize the total discounted inventory /backlog costs. The demand has two components: one is deterministic with constant rate d and the other is stochastic...
Persistent link: https://www.econbiz.de/10012835286
We consider a production planning problem in an N-machine flowshop subject to breakdown and repair of machines and to non-negativity constraints on work-in process. The machine capacities and demand processes are assumed to be finite-state Markov chains. The problem is to choose the rates of...
Persistent link: https://www.econbiz.de/10012835291
This paper is concerned with the problem of production planning in a flexible manufacturing system consisting of a single or parallel failure-prone machines producing a number of different products. The objective is to choose the rates of production of the various products over time in order to...
Persistent link: https://www.econbiz.de/10012835293
This paper is concerned with the problem of production planning in a flexible manufacturing system consisting of a single or parallel failure-prone machines producing a number of different products. The objective is to choose the rates of production of the various products over time in order to...
Persistent link: https://www.econbiz.de/10012835668