Showing 1 - 10 of 12
This paper presents a profit-oriented shift scheduling approach for inbound contact centers. The focus is on systems in which multiple agent classes with different qualifications serve multiple customer classes with different needs. We assume that customers are impatient, abandon if they have to...
Persistent link: https://www.econbiz.de/10003575481
Persistent link: https://www.econbiz.de/10001303158
Persistent link: https://www.econbiz.de/10001729538
In stochastic lot sizing subject to dynamic and random demand, the minimization of operational costs is not the only conceivable objective. Minimizing the tardiness in customer demand satisfaction is no less important. Furthermore, the decision maker is interested in production plan stability....
Persistent link: https://www.econbiz.de/10014366827
This paper treats the problem of setting the inventory level and optimizing the buffer allocation of closed-loop flow lines operating under the constant-work-in-process (CONWIP) protocol. We solve a very large but simple linear program that models an entire simulation run of a closed-loop flow...
Persistent link: https://www.econbiz.de/10013127286
This paper treats the problem of setting the inventory level of closed-loop flow lines operating under the constant-work-in-process (CONWIP) protocol. We solve a huge but simple linear program that models an entire simulation run of a closed-loop flow line in discrete time to determine a...
Persistent link: https://www.econbiz.de/10003930858
The transportation processes for patients, personnel, and material in large and complex maximum-care hospitals with many departments can consume significant resources and thus induce substantial logistics costs. These costs are largely determined by the allocation of the different departments...
Persistent link: https://www.econbiz.de/10010344961
Persistent link: https://www.econbiz.de/10008823426
Persistent link: https://www.econbiz.de/10009273345
This paper presents a linear programming approach to analyze and optimize flow lines with limited buffer capacities and stochastic processing times. The basic idea is to solve a huge but simple linear program that models an entire simulation run of a multi-stage production process in discrete...
Persistent link: https://www.econbiz.de/10003663182