Showing 1 - 8 of 8
Persistent link: https://www.econbiz.de/10009242303
Persistent link: https://www.econbiz.de/10003824827
Persistent link: https://www.econbiz.de/10012414944
Persistent link: https://www.econbiz.de/10012434783
Persistent link: https://www.econbiz.de/10003811737
Persistent link: https://www.econbiz.de/10011373991
A heuristic procedure is developed for minimizing makespan in flow-shop scheduling problems. In comparison with current algorithms, our algorithm seems to result in an improved makespan with a small additional computational effort. An algorithm is also developed to minimize the required number...
Persistent link: https://www.econbiz.de/10012746785
Persistent link: https://www.econbiz.de/10011946073