Showing 1 - 2 of 2
Persistent link: https://www.econbiz.de/10010487456
In this paper, we study the problem of minimizing the maximum total completion time per machine on m parallel and identical machines. We prove that the problem is strongly NP-hard if m is a part of the input. When m is a given number, a pseudo-polynomial time dynamic programming is proposed. We...
Persistent link: https://www.econbiz.de/10011117500