Showing 1 - 10 of 1,438
In this study, an inexact multistage joint-probabilistic programming (IMJP) method is developed for tackling … uncertainties presented as interval values and joint probabilities. IMJP improves upon the existing multistage programming and … violated within a multistage context. The developed method is applied to a case study of water-resources management within a …
Persistent link: https://www.econbiz.de/10010794079
Persistent link: https://www.econbiz.de/10008741088
The following paper explores the possible inter-linkage of the Ganges and Brahmaputra River Basin and analyzes its effect on future water allocation between the upstream country, India, and the downstream country, Bangladesh. We find that water transfer from the Brahmaputra River could be...
Persistent link: https://www.econbiz.de/10008741175
Persistent link: https://www.econbiz.de/10011274290
uncertainties described in terms of interval values and probability distributions over a multi-stage context. Moreover, it can … reflect dynamic decisions for facility-capacity expansion during the planning horizon. The developed model is applied to a … case of planning GHG-emission mitigation, demonstrating that IFSP is applicable to reflecting complexities of multi …
Persistent link: https://www.econbiz.de/10010809877
Persistent link: https://www.econbiz.de/10004995455
Persistent link: https://www.econbiz.de/10008688133
Persistent link: https://www.econbiz.de/10004772338
Persistent link: https://www.econbiz.de/10004821997
Persistent link: https://www.econbiz.de/10004826838