Showing 1 - 2 of 2
Persistent link: https://www.econbiz.de/10010510039
This paper studies preemptive bi-criteria scheduling on m parallel machines with machine unavailable intervals. The goal is to minimize the total completion time subject to the constraint that the makespan is at most a constant T. We study the unavailability model such that the number of...
Persistent link: https://www.econbiz.de/10011209321