Showing 1 - 5 of 5
This paper considers the risk model perturbed by a diffusion process with a time delay in the arrival of the first two claims and takes into account dependence between claim amounts and the claim inter-occurrence times. Assuming that the time arrival of the first claim follows a generalized...
Persistent link: https://www.econbiz.de/10012203649
Persistent link: https://www.econbiz.de/10013173245
Persistent link: https://www.econbiz.de/10013440228
Persistent link: https://www.econbiz.de/10014426395
Persistent link: https://www.econbiz.de/10011292931